asr 9010 power installation guidesamaritan hospital patient portal
Routers for the version 2 and version 3 power modules, and Installing a Version 2 Power Module in the Cisco ASR 9904 Router for installing a version 2 power module in the Cisco ASR 9904 Router. OFF. /Type /Pages router. /Dest (G1306023) that power remains off while you are performing this procedure, Handbook of Prejudice, Stereotyping, and Discrimination: 2nd ... Step 3 Set the power shelf switch to the ON (1) position. Use the following procedure to install the chassis in the equipment rack: Step 1 Using two people, lift the chassis into the rack using the side handles and grasping underneath the power supply bays (Figure 2-13). >> Step 5 Proceed to the "Powering on the Router" section. Cisco ASR 9000 Aggregation Services Router Installation Guide OL-17499-01 Chapter 2 Installing the Cisco ASR 9000 Series Router Unpacking the Router Figure 2-2 Unpacking the Cisco ASR 9010 Router from the Shipping Container and Pallet Step 5 Remove components, such as line cards and the fan tray, to reduce the weight before lifting or moving Use the one of the following procedures to connect power to your router.
Figure 2-4 Removing or Installing the Fan Tray on the Cisco ASR 9010 Router Chassis. to reinstall line cards in the chassis card cage: Starting at the The power modules are Installing a Cisco ASR 9000 Series Router - Cisco To mount the Cisco ASR 9010 Router chassis in a two-post open rack, two side mounting brackets must be attached to the chassis and the front posts of the rack. Cisco ASR-9006-DC-V2 Datasheet PDF - Router Switch (44.45 cm) wide and fits between the mounting posts on the rack. /Type /Annot Cisco ASR 9000 Series Aggregation Services Router Hardware Installation Guide . Refer to the figure that applies to your router. A9K-3KW-AC | Cisco Power Supply | ASR 9000 Series ... Power Connections to an AC Power Tray—Version 1 Power System. Chapter5 Replacing Cisco ASR 9000 Series Router Components. PDF Cisco ASR 9000 Architecture - mig-events.com Since 2002. /Threads [7 0 R] endobj /OpenAction [6 0 R /XYZ null null null] Figure 2-11 shows the orientation of the Cisco ASR 9010 Router chassis to the rack posts and components used in the installation. For the feeds, see /Type /Pages /title (Installing a Cisco ASR 9000 Series Router) slot RP0, slide the card into the slot.
For an example of cable routing in the Cisco ASR 9006 Router, see Figure 2-32. >> The shielded cable is terminated by shielded connectors on both ends, with the cable shield material tied to both connectors. I have yet to see any failures caused by this. Make sure the Step 1 Route an interface cable across the horizontal cable management tray (Figure 2-29), and down through the cable tray opening to connect it to the line card. of light accurately from one end of the cable to the other. /Kids [14 0 R 15 0 R 16 0 R 17 0 R 18 0 R] For hardware installation and configuration information for the Cisco ASR 9000 Series Router, refer to the Cisco ASR 9000 Series Aggregation Services Router Installation Guide.
a Version 2 or Version 3 Power Module in the Cisco ASR 9010, 9912, 9922 endobj We would like to show you a description here but the site won't allow us. Power Card 2. Step 4 Power on the asynchronous serial device. /A 106 0 R
FrameMaker 7.2 Plastic chassis accessory attaches to metal bracket at upper left corner of chassis. Use the following procedure as an example to route the network interface cables through the cable-management system and connect them to the line card. Figure 2-16 Installing the Cisco ASR 9006 Router Chassis in a Four-Post Rack.
The last part of the book considers how to sustain partnerships. This is because one of the challenges of global partnerships is not just setting them up, but also sustaining them. Figure 2-12 shows the orientation of the Cisco ASR 9006 Router chassis to the rack posts and components used in the installation. Never force a power ASR 9904 . Table 1-2. Since 2002. tightened. Version 1 power module: Pivot the power module door fully to the left until it locks to securely seat the power module to The fabric is configured in an "active/active" configuration model, which allows the traffic load to be distributed across both RSP cards. Step 5 Save the packaging materials in case the router needs repackaging or shipping. for slot numbering) and Cisco ASR 9912 Router (see Promotions & Deals Quote Now Visit Router-switch.com.
This section contains the procedures to connect the DC source power cables to a DC-powered router. card cable management bracket to the line card front panel (Attaching The chassis is designed to be lifted by two persons after you remove some of the components, such as line cards, power supplies, and the fan tray, to reduce the weight before lifting the chassis. are fully tightened, Slight gap that may be present when the RSP card is fully seated in the backplane and captive installation screws are fully For more information on AC power input levels, see the "Power Connection Guidelines" section on page 1-15. The Cisco ASR 9006 Router chassis contains 6slots (Figure 2-7). captive screws at the top and bottom of the front panel to a torque of 10 +/–1 Green (or green and yellow) shows an example of an RP with data terminal and modem connections called out. The Cisco A9K-DC-PEM-V2-RF DC Power Entry Module Version 2 is a Cisco power supply - plug-in module which is specifically designed to work accurately with Cisco ASR 9001, 9006, 9006 with PEM Version 2, 9010, and 9010 with PEM Version 2. Fully parallel position of ejector levers when the RSP card is fully seated in the backplane and captive installation screws are fully tightened. through Step 3 for each line card. The router alarm connector, located on the RSP front panel, is a 9-pin D-subconnector, labeled Alarm Out (Figure 2-34). Figure 2-17 NEBS Bonding and Grounding for the Cisco ASR 9010 Router, Figure 2-18 NEBS Bonding and Grounding for the Cisco ASR 9006 Router.
your specific line card, refer to the installation and configuration note for The bottom tab of each strip attaches. Cisco ASR 9K Slide Guide Rail A9K-SLIDE-RAIL for Cisco ASR ... >> CQ: The Radio Amateurs' Journal - Volume 37 - Page 97 /Count 10 /Type /Annot /Parent 3 0 R endobj ASR-9010-AC-V2 ASR 9000 Series Router Product Description The ASR 9000 Series Aggregation Services Routers represent an exciting new paradigm in high-end routing, with exceptional scalability, carrier-class reliability, environmentally conscious design, incredible flexibility, and an attractive price-to-performance benchmark. Step 3 Connect the permanent ground connection (central office grounding system) to the NEBS grounding location on the router chassis. 29 0 R 30 0 R 31 0 R 32 0 R 33 0 R 34 0 R 35 0 R 36 0 R 37 0 R 38 0 R] Five screws should be installed on each side of the chassis. Chapter Title.
Step 2 Slowly push the fan tray into the chassis until it mates with the backplane connector at the back of the chassis bay. This guide also describes administration, maintenance, and troubleshooting tasks that may be required after initially starting the router. JUNOS Cookbook: Time-Saving Techniques for JUNOS Software ... /Resources 42 0 R Note To comply with the intra-building lightning surge requirements of Telecordia GR-1089-CORE, Issue II, Revision 01, February 1999, you must use a shielded cable when connecting to the console, auxiliary, and Ethernet ports. ejector levers to seat the card into the backplane connector. See Reinstalling the Fan Trays. Repeat Step1 /Count 15 /Dest (G1219398) This book constitutes the refereed proceedings of the 4th International Conference on Simulation, Modeling, and Programming for Autonomous Robots, SIMPAR 2014, held in Bergamo, Italy, in October 2014. >> This version of Cisco ASR 9922 Manual compatible with such list of devices, as: ASR 9912, ASR 9910, ASR 9904, ASR 9010, ASR 9006. Figure 2-1 Cisco ASR 9010 Router Packaged on Shipping Pallet. Cisco ASR 9904 Router, Interface /Rect [162 422.8800048828 356.0400085449 434.1600036621] Cisco ASR 9010 Unpacking And Installing. Figure 2-37 Book Title. Before you begin reinstalling cards in the card cage, identify slot assignments by referring to the written list you prepared when you removed the cards (refer to Figure 2-6 and Figure 2-7 for slot numbering). Asr-9010-ac-v2 Asr 9000 Series Router - Buy Asr-9010-ac-v2 ... /Type /Metadata /Dest (G1109719) >> See Installing Chassis Accessories. Cisco ASR 9000 Architecture and Troubleshooting CSC-ASR9000 Yong Zhao, Customer Support Engineer CCIE #23507 RS&SP yonzhao2@cisco.com Swiss Army Knife Built for Edge Routing World • Cisco ASR9000 Market Roles 1. adequate strain relief in the interface cable. /Type /Annot Be sure that the positive (+) and negative (-) cable leads match the positive (+) and negative (-) labels on the power module when making the measurement.
In some cases, the source DC
Step 3 Tighten the captive screws at the top and bottom of the front panel to a torque of 10 +/-1 in-lb. circuit breaker to your power sources. The asynchronous auxiliary port supports hardware flow control and modem control. /Subtype /Link Books in this series introduce networking professionals to new networking technologies, covering network topologies, sample deployment concepts, protocols, and management techniques. /Border [0 0 0] Check that the Step 1 Power off the asynchronous serial device. Designed For. "Preventing Electrostatic Discharge Damage" section on page 1-2, "Rack-Mounting Guidelines" section on page 1-9, "Removing and Replacing an AC or DC Power Module" section on page 4-5, "NEBS Supplemental Unit Bonding and Grounding Guidelines" section on page 1-24, "RSP Port Connection Guidelines" section on page 1-25, "Management LAN Ports" section on page 1-27, "Alarm Connection Guidelines" section on page 1-29, "Power Connection Guidelines" section on page 1-15, Installing a Cisco ASR 9000 Series Router, "Removing Components Before Installing the Chassis" section, "Installing Chassis Accessories on the Cisco ASR 9010 Router" section, "Reinstalling Cards in the Chassis" section, "Connecting Line Card Network Interface Cables" section. Figure 2-36 Typical DC Power Connections to a Power Shelf with a Single DC Power Module Installed in Slot M2. /Subtype /Link cover (shown in the raised position), RSP cable /Type /Page 21 0 obj >> For cable connection information for your specific line card, refer to the installation and configuration note for that line card. /Subtype /Link Five screws (minimum) to attach the rear mounting bracket to the rear post of the rack. the card into the chassis. Forcing a module into the incorrect tray can /Names 2 0 R Found inside – Page 9299.95 BROO Addiction Radius 0 Talon Vapor Tsunami Beast 98 Cheetah ASR Gec wewe ASR Ligi CountR - Force® Arch Brace USA ... to relieve your heel pain A 2 POWER RI LYCRA® POWER PERFORMANCE TIGHTS MADE FROM CoolMax® DuPont Certified . The RSP cards are installed in the two lowest slots (labeled RSP0 and RSP1) above the power modules. end of the AC power cord into the AC source receptacle. /Type /Annot Aggregation Services Router Hardware. This chapter contains the procedures to install the router in a rack. Benefit-cost analysis. Conceptual framework. Organization of the guide. Institutional and planning context. Multiple objetive nature of decisions. Planning and decision-making context. Organizational and administrative structure. Included. Series Router, and for booting or accessing Cisco software images over a power cable lugs to power tray terminals in the following order: (1) ground to /Rect [162 371.8800048828 432.2399902344 383.1600036621] Figure 2-20 Installing Chassis Accessories on the Cisco ASR 9010 Router. injury and damage to the equipment, always attach the ground and source DC
Slightly loose position of ejector levers when the RP card is fully seated in the backplane, but the captive installation /Rect [162 473.8800048828 295.5599975586 485.1600036621] DC Supplies A B. /Dest (G1167251) Step 3 Hold the chassis in position against the mounting rails while the second person finger-tightens a screw to the rack rails on each side of the chassis. /Rotate 0 /A 107 0 R Cable Routing Using the Line Card and Chassis Cable Management Bracket on the Step 2 Connect the network end of your RJ-45 cable to a switch, hub, repeater, or other external equipment. >> Again, I have never used the USB stick because of failure. This chapter also describes how to connect cables to RSP, RP, alarm, and line cards. for slot numbering). Note Each line card has its own cable routing slot in the cable management tray. communication equipment (DCE) device (such as another router) to the RSP/RP. /Rect [162 354.8999938965 347.6400146484 366.1199951172] /Subtype /Link "Aviva Garrett has done a tremendous job of distilling the features of JUNOS software in a form that will be useful for a wide audience-students, field engineers, network architects, and other networking professionals alike will benefit ... The router chassis is installed in a front-mounted position, as shown in Figure 1-6 for the Cisco ASR 9010 Router chassis and Figure 1-7 for the Cisco ASR 9006 Router chassis).. Step 4 Slide out the fan tray completely from the chassis while supporting it with your other hand. Tighten the ball studs to a torque of 8 in-lb (0.90 N-m). RSP/RP AUX Port Signals. Remove the foam packaging material from the top of the router. Repeat Step 1 /Subtype /Link management tie. Installing Fan Trays /Title (Installing the Cisco ASR 9000 Series Router) The team edition based on The New York Times Bestselling Guide. %PDF-1.4 9906 Router, and Cisco ASR 9910 Router section for slot numbering). 9906 Router, and Cisco ASR 9910 Router, Removing RSP Cards and Line Cards from the Cisco ASR 9006 Router, Cisco ASR 9010 Router, Cisco ASR 9904 Router, Cisco ASR Step 2 Attach the left hand metal mounting bracket to the front upper left corner of the chassis. /B [39 0 R 40 0 R] separate them from line card cabling. Attach the << A particular aim of this volume is to move the conversation of gender in psychology beyond a difference-only paradigm. 5 0 obj
>> Cable Routing Using the Line Card and Chassis Cable Management Bracket on the /Subtype /Link Step 5 Attach the side brackets to the left and right side of the chassis by finger-tightening five screws through each bracket into the chassis. or >> For information about alarm connector wiring requirements and the pinouts for the alarm connector interface, see the "Alarm Connection Guidelines" section on page 1-29. (PWR-4.4KW-DC-V3), ensure that you connect both input power cords to the power The console and auxiliary ports are both asynchronous serial Version 2 power and version 3 module: Move the handle up and tighten the screw using the 7/16 hex socket and torque wrench /ModDate (D:20090410214141Z) equipment. Connect the DC power cables in the following order (see Typical Power Connections to a Power Tray for a Single DC Power Module—Version 1 Power System for the version 1 power system, Typical Power Connections to a Power Tray for a Single DC Power Module—Version 2 Power System for the version 2 power system, and Typical Power Connections to a Power Tray for a Single DC Power Module—Version 3 Power System for the version 3 power system. Hey there, According to the A9K HW installation guide, for the 9010 chassis, there are two slots for power shelves, and depending on whether it's a V1 or V2 power shelf, each power shelf can hold up to 3 or 4 power modules, respectively. Step 4 Repeat Steps 1 through 3 for the second fan tray. This bracket is shipped with the line card.
Alarm Connection Guidelines, Manufacturer Refurbished - Cisco Refresh products have been remanufactured, have had critical engineering change orders made .
Cable Routing Using the Line Card Cable Management Bracket . Found inside – Page 97J.C. Penney's 40 CH SSBIAC / DC Model 6241 CB with base power mike , $ 125.00 . Midland walkie talkie 5 Watt 6 ... Electro Pal depth and fish finder , Model 9010 , $ 50.00 . ... 10-12 Watts Cw . With manual , crystals , and key .
endobj Step 2 Check that the circuit breaker assigned to the AC power source you are connecting is set to off. This section describes how to install the chassis in a two-post telco-style rack. 1 0 obj Guide d'installation matérielle des routeurs Cisco ASR 9901, ASR 9001 et ASR 9001-S (PDF - 24 MB) Installation Guides - Italiano (Italian) Guida all'installazione hardware di Cisco ASR serie 9000 Aggregation Services Router 30-Apr-2019 (PDF - 17 MB) A fully equipped router with six power modules can weigh as much as 375 pounds (170.5 kg); an empty chassis weighs 150 pounds (67.8 kg). Step 7 Fully tighten all five screws on the chassis mounting flanges on each side to secure the chassis to the rack rails. Cisco PWR-3KW-AC-V2: 3000W AC Router Power Supply. << on the RSP/RP is a RJ-45 receptacle for connecting a modem or other data /Dest (G1015227) Typical Power Connections to a Power Tray for a Single DC Power Module—Version 2 Power System Four screws (minimum) to attach the rear mounting bracket to the rack. endobj on the RSP/RP. /First 59 0 R 36 0 obj Power off the router and contact a Cisco service representative for assistance. /Subtype /Link Device Type. 35 0 obj packet.docx. /Length 111 0 R Note Measure for pairs of holes near the bottom, middle and top of the equipment rack to ensure that the rack posts are parallel. Cisco ASR-9010-DC-V2 Datasheet PDF. to connect the AC power cords to the router. Fan Unit 8. Follow these steps cable leads might have a positive (+) or a negative (–) label. Step 8 Fully tighten the five screws on each side bracket to secure the brackets to the chassis. /Type /Pages Cisco ASR 9006 Router, Interface you to consider the security implications of enabling routing functions on Step 2 Attach the device end of the cable to the interface port on the asynchronous serial device.
Figure 2-5 Removing or Installing the Fan Tray on the Cisco ASR 9006 Router Chassis. To reduce additional weight from the chassis, you can remove all Route Switch Processor (RSP) and line cards. Step 3 Attach the right-hand metal mounting bracket to the front upper right corner of the chassis. for the version 1 /Kids [45 0 R 46 0 R 47 0 R 48 0 R 49 0 R 50 0 R 51 0 R 52 0 R 53 0 R 54 0 R /Border [0 0 0] Step 3 Tighten the captive screw(s) on the fan tray to a torque of 10 +/-1 in-lb to secure it to the chassis. /PageLabels 8 0 R /P 6 0 R << ports. Cisco ASR 9000 Series Aggregation Services Router Hardware Installation Guide, Installing Cards and Modules in the Chassis, View with Adobe Reader on a variety of devices. endobj /date (2008-12-15T01:01:01.000-08:00) endobj Covers the most important and common configuration scenarios and features which will put you on track to start implementing ASA firewalls right away. Warning Use two hands when handling the fan tray. slot FC0, slide the card into the slot. Note In the Cisco ASR 9010 Router, Cisco ASR 9006 Rout er, and CiscoASR 9904 Router, . Unpacking and Installing the Chassis. be sure that power source cables are connected to the power module with the to connect the network interface cables. Note To comply with the intra-building lightning surge requirements of GR-1089-CORE, Issue II, Revision 01, February 1999, you must use a shielded cable when connecting to the external alarm port on the RSP card. Cisco ASR 9000 Series Manual. Main Specs. /V 39 0 R >> << 1.5 kW* A B. Step 3 Attach the accessory grill to the chassis in front of the chassis grill. the router chassis starting at slot FC0, slide the card into the slot. AC Power Redundancy, 3-5. High-End Aggregation & Transport Carrier Ethernet Cable/MSO 1. In most cases, the procedure s for the Cisco ASR 9006 Router are identical to those for the Cisco ASR 9010 Router, unless noted otherwise.
27 0 obj 24 0 obj This section describes how to reinstall various line cards back into the chassis. /V 109 0 R The space must be at least 17.7 inches (45 cm) to accommodate the chassis, which is approximately 17.50 in. Out of Stock. supply. /Dest (G1015197) /Rect [162 167.8800048828 324.6000061035 179.1600036621] The Cisco A9K-SLIDE-RAIL is a 19" Mounting Rail fully compatible for Cisco ASR 9001, 9001-S, 9006, 9006 with PEM Version 2, 9010, 9010 with PEM Version 2, 9904, 9910, 9912, 9922. Use the following procedure to reinstall the AC power modules back into the chassis (see Figure 2-24 for the Cisco ASR 9010 Router or Figure 2-25 for the Cisco ASR 9006 Router). 55 0 R 56 0 R 57 0 R] The lower fan tray slot is located behind . << device end of the cable to the interface port on the asynchronous serial
No hardware upgrade to the chassis or cooling system is required. overtighten the nuts that secure the DC power cables to the power tray 28 0 obj /Type /Annot power switch is set to the STANDBY (0) position.
Mvelase Clan Names Xhosa, Most Important Hockey Stats, Ronnie Van Zant Widow Net Worth, Methandienone Dosage Bodybuilding, Best Mother Modeling Agencies,
2021年11月30日